Hampton by Hilton Balice

The project involves construction of a Hampton by Hilton hotel with the necessary infrastructure in Balice, by Cracow.

 

The main body of the building is a cuboid which has been visually divided into two parts – the ground floor and the residential section. The effect was achieved by varying the colour schemes of the façades and adding a canopy to a section of the building. The roof has been equipped with louvres which provide a visual and acoustic barrier around the equipment installed on it.

 

The chosen colour scheme, consistent with the guidelines in the local urban plan, consists of grey and white hues. The ground floor is fully grey, while the higher floors are a mix of grey and white, making up a dynamic colour palette.

 

The building will consist of six levels, of which one is located underground. The total area of the building will be 7800 sqm, with 173 rooms, a restaurant section and 30 parking spaces. The building will be fully accessible.

Livecam

Client

Vanezza Sp. z o.o.

Total surface

7 750 mkw

Project type

hotel building

Usable surface

7 108 mkw

Place

ul. Medweckiego, Balice

Realisation period

2020 - 2021

Architect

SUSUŁ & STRAMA ARCHITEKCI

Capacity

29 431 m3

Scope of work

general contracting

Location