DESOTEC

About the project

The project involved the construction of a complex of single-story buildings for the Deposit Production and Filtration Technology Plantin Gdańsk for DESOTEC. The scope of work included the construction of a production hall with office space, a maneuvering area, and a parking lot. The plant hall was constructed as a steel-framed roof structure supported by reinforced concrete columns and monolithic footings. The partition wall between the warehouse and production was constructed of sandwich panels with 8 cm thick polystyrene infill. The office section was constructed of silicate block masonry with reinforced concrete tie beams and studs. The work was completed using a design-build system and was completed on a turnkey basis.​

CLIENT​

Desotec Polska​

PROJECT TYPE

Industrial​

LOCATION​

Maszynowa 28, Gdańsk​

ARCHITECT​

CFE​

AREA​

Usable: 1,160 m², ​

total: 1,600 m²​

VOLUME​

8,250 m³​

SCOPE OF WORK​

Design and build​

IMPLEMENTATION PERIOD​

2011​

See our other industrial projects

Industrial

Industrial

This website uses cookies to ensure you get the best experience on our website. Cookies Policy