The project involves the construction of a new factory producing battery systems for the automotive industry, amongst others. The project involved the construction of: a production hall, two dispatch halls, two high-bay warehouses 20 metres high, a two-storey office building with an area of approximately 5,000 m², a technical building and a fire-fighting pump station. External works were also carried out, such as: utility networks, drainage, reservoirs and the road layout. The facility was designed to allow for the installation of large-scale photovoltaic panels. Several rain gardens were created on the site, which collect all rainwater within the Investor’s premises. The factory is located in the Port of Gdańsk, near the A1 motorway and the S7 expressway.

CLIENT

Northvolt

TYPE OF PROJECT

industrial

PLACE

Andruszkiewicza, Gdańsk

ARCHITECT

Axa + F Anna Flak

AREA

29 055 m2

SCOPE OF WORKS

detailed design and construction works

CONSTRUCTION PERIOD

11.2021 - 04.2023

See our other industrial projects

This website uses cookies to ensure you get the best experience on our website. Cookies Policy