SICPA

About the project

The project involved the construction of a SICPA-Polska printing inkbottling plant. It included a production facility with a warehouse and production area, and a two-story office building. Additionally, the site includes technical infrastructure facilities and parking lots offering 39 above-ground parking spaces. The facility will be equipped with safety features that ensure complete elimination of negative environmental impacts both during operation and in the event of a breakdown or fire. These include a high-pressure ESFR (Electro-Fluid Recirculation) sprinkler system, a hydrant system, a network of explosion sensors, air and soil quality monitoring, and firewater retention.​

CLIENT​

Sicpa Polska​

PROJECT TYPE​

industrial​

LOCATION​

121D Piłsudskiego Street, Marki​

ARCHITECT​

Sicpa​

AREA​

Usable: 2,410 m², ​

Total: 2,600 m²​

VOLUME​

10,700 m³​

SCOPE OF WORK​

Construction works​

IMPLEMENTATION PERIOD​

2001 – 2002​

See our other industrial projects

Industrial

Industrial

This website uses cookies to ensure you get the best experience on our website. Cookies Policy