SZCZECIN BRIDGE

About the project

The crossing over the Regalica River in Szczecin consists of WD1 and WD3 overpasses built as part of the bridge crossing development. The three-span WD-1 overpass is 96.60 m long and 14.67 m wide. The superstructure: a steel structure with a reinforced concrete slab, reinforced concrete pillars and openwork abutments, founded on piles. The WD-3 overpass is composed of three parts. A total of 280 tons of steel structure, 1,300 tons of reinforcement, and over 4,000 cu m of concrete were embedded. The reinforced concrete works were completed using in-house scaffolding. The works began in winter under difficult weather conditions.

CLIENT

General Directorate for National Roads and Motorways (currently GDDKiA)

TYPE OF PROJECT

civil engineering

PLACE

Szczecin

AREA

total length: 362,5 m

CAPACITY

36 350 m3

SCOPE OF WORKS

construction works

CONSTRUCTION PERIOD

2000 - 2001

See our other projects

Our projects

Our projects

This website uses cookies to ensure you get the best experience on our website. Cookies Policy