Tube City
CLIENT
Tube City IMS
TYPE OF PROJECT
industrial
PLACE
Koksownicza 8, Dąbrowa Górnicza
ARCHITECT
Biprohut, Budecon
AREA
steel structure area: 8 400 m2, road and yard surface area: 32 000 m2
CAPACITY
SCOPE OF WORKS
execution design + build
CONSTRUCTION PERIOD
2015 - 2016
The project involved the construction of a scrap yard at the ArcelorMittal steelworks. The scope of works included the construction of a scrap yard (2 km long railway track, reinforced concrete boxes, gas station, new road layout, electrical network) and the reconstruction of existing buildings, existing road layout and stormwater drainage, construction of new cable chambers and cables.