Coca Cola II

Rozbudowa II

CLIENT

Coca Cola HBC Polska

TYPE OF PROJECT

industrial

PLACE

Przemysłowa 2, Radzymin

ARCHITECT

Probadex

AREA

usable area: 2 056 m2, gross area: 2 090 m2

CAPACITY

27 104 m3

SCOPE OF WORKS

construction works

CONSTRUCTION PERIOD

2018

The project concerns the extension and reconstruction of the Coca-Cola HBC Production Plant in Radzymin for a warehouse of raw materials with internal installations and technical infrastructure. The scope of works includes the reconstruction of the existing technological pipelines, the demolition of the existing loading sheds, as well as the construction and reconstruction of the infrastructure. The warehouse is a single-storey building with a separate two-story segment. A social-office part with offices, sanitary facilities and an archive has also been planned. The form and architectural shape of the building has been adapted to the existing production plant.

photo
photo
photo
photo
photo
photo
Completed Construction