Most Szczecin

CLIENT

General Directorate for National Roads and Motorways (currently GDDKiA)

TYPE OF PROJECT

civil engineering

PLACE

Szczecin

ARCHITECT

AREA

total length: 362,5 m

CAPACITY

36 350 m3

SCOPE OF WORKS

construction works

CONSTRUCTION PERIOD

2000 - 2001

The crossing over the Regalica River in Szczecin consists of WD1 and WD3 overpasses built as part of the bridge crossing development. The three-span WD-1 overpass is 96.60 m long and 14.67 m wide. The superstructure: a steel structure with a reinforced concrete slab, reinforced concrete pillars and openwork abutments, founded on piles. The WD-3 overpass is composed of three parts. A total of 280 tons of steel structure, 1,300 tons of reinforcement, and over 4,000 cu m of concrete were embedded. The reinforced concrete works were completed using in-house scaffolding. The works began in winter under difficult weather conditions.