Rector

CLIENT

Rector

TYPE OF PROJECT

industrial

PLACE

Mszczonów

ARCHITECT

CFE, Tremend

AREA

4 500 m2

CAPACITY

36 000 m3

SCOPE OF WORKS

building permit design + build

CONSTRUCTION PERIOD

2013

The project involved the construction of RECTOR Concrete Prefabrication Plant in Mszczonów. The scope of works included the construction of an office building and a gatehouse, works related to the removal of the humus layer from the entire plot, the construction of roads and a car park, a storage yard and a green belt, the construction of a storm water drainage system, and a sanitary sewage system, water supply and gas networks. The development was implemented in the design-build contract system. All the design and building works involving Rector’s precast concrete plant were completed on time and without any problems.

photo
photo
photo
photo
photo
photo
Completed Construction